BRAC Intelligence Operations Center

Base Realignment and Closure Commission BRAC
BRAC Intelligence Operations Center, Lackland Air Force Base, San Antonio, Texas
Lantz-Boggio Architects

Civil design for utilities, drainage, 3900 ft long access road, concrete parking and walkways to building for approx. 109 parking spaces, storm water system, 5 pipe culverts, and cost estimates for 40,000 sq ft design-build project. Utilities design includes 12 inch water mains extending from southside of SW Military Drive, a 6-inch water line to be bored under SW Military Drive, 3-inch PVC potable water line, 6-inch PVC sewer line with lift station and 3-inch force main. Obtained TxDOT, SAWS and CPS permitting and TDLR plan review approval. Topographic surveys to identify existing surface features. Construction cost: $10.2 million. Completed in May of 2009.

Client

Department of US Air Force

Location

San Antonio, Texas

Status

Completed

Lorem Ipsum has been the industrys standard dummy text ever since @ ThemeRox
What Our Clients Are Saying

Emilio R. Molina, Jr., R.P.L.S. – San Antonio River Authority

On a majority of their contracts, BMBI has provided surveying services on our projects, most recently for the Mission Reach Project and the Salatrillo Reuse Water Line project to name two. I have worked directly with BMBI’s surveying department for several years. They handle any request we give them with efficiency. They consistently deliver quality results, making Bain Medina Bain one of SARA’s preferred consultants.

Bain Medina Bain