Mission Reach – San Antonio River Improvements

Mission Reach – San Antonio River Improvements
  • Mission Reach – San Antonio River Improvements
  • Mission Reach – San Antonio River Improvements
Because the Enhancement project sites are adjacent to the river, low impact development has been a priority of the design effort. The implementation of bioswales, drainage filter strips, pervious pavements, low water consuming plant material, and where possible the use of recycled water for irritation have been included in the project.

A majority of the Enhancement projects have required coordination between multiple Public Entity Clients. BMB worked on these multiple entities, through their design efforts, to forge bonds and advance projects that are in the best interest of the citizens of San Antonio.

Projects have included Mission County Park, Hot Wells, Padre Park Street Connection, City Park Street Connection, San Juan Diversion Dam Park, Espada Dam Park, San Juan Acequia Trail, Mission San Juan Portal, and Theo Avenue Street Realignment. Survey services of existing features for planned Mission Reach improvements to street connections and park linkages, including topographic surveys, boundary surveys, right-of-way determination, tree surveys, and utilities locates at various street connections. Also, performed topographic, boundary and tree location surveys. Civil design services for planned Mission Reach improvements at various street linkage trailheads along the river in support of hike and bike trail improvements. Services at the Mission Road, Roosevelt Ave. and VFW Blvd street connections have included site grading plans, traffic control plan, and drainage study reports to determine hydrology for the site based on existing and developed conditions, bid and construction administration services.

Client

City of San Antonio

Location

San Antonio, Texas

Status

Complete

Lorem Ipsum has been the industrys standard dummy text ever since @ ThemeRox
What Our Clients Are Saying

David Pulido, P.E. – City of San Antonio

It is my pleasure to provide this letter for Bain Medina Bain based on their performance for the Marbach Road Phase IIA (Military to Rawhide) project. Bain Medina Bain worked diligently with the City and all other consultants involved in the project to deliver design solutions that would offer long-lasting benefits and accommodate the growth in the area. They continued to stay responsive and available at a moment’s notice from design through project completion. This is one of the values that the City holds in the highest regards os our consultants.

Bain Medina Bain