Riverwalk Capital Improvements

Riverwalk Capital Improvements
  • Riverwalk Capital Improvements
  • Riverwalk Capital Improvements
  • Riverwalk Capital Improvements
  • Riverwalk Capital Improvements
  • Riverwalk Capital Improvements
  • Riverwalk Capital Improvements

Riverwalk Capital Improvements

Utilizing topographic and LEICA Scanning Technology, BMB provided horizontal and vertical control surveying services and 3D representations in these specific areas:

  • Area 8 – La Mansion, Navarro Street Stairs (660 ft.), and South Bank (400 ft.)
  • Area 9 – West Bank, South of Pedestrian Bridge of Crockett (320 ft.)
  • Area 10a & b – Market Street Pedestrian Bridge street level to Hilton (620 ft.)
  • Area 11 – S Presa Bridge to W of Navarro Bridge, Wedding Island and street access (420 ft.)
  • Area 12 – Chamber of Commerce Bldg. river bank, pedestrian bridges at river fork and street level of Commerce Street
  • Area 13-20 – River Bend and River Extension, Market Bridge to Alamo Bridge, Inner Loop from N Flood Gate to The South Bank Complex

Client

City of San Antonio

Location

San Antonio, Texas

Status

Complete

Lorem Ipsum has been the industrys standard dummy text ever since @ ThemeRox
What Our Clients Are Saying

John W. Strybos, P.E., C.E.M. – Alamo Colleges

It is my pleasure to provide this letter of reference to Bain Medina Bain for the work they preformed on Villaret Road ( Highway 16 to Jennifer). Originally a 3,500 foot, two-lane roadway, Bain Medina Bain helped to realize the vision of Alamo Colleges and the City to improve drainage, widen to four lanes and include a turning lane, bike lanes and sidewalks. Their proficiency, professionalism and responsiveness keep them at the top of our preferred consultants.

Bain Medina Bain