Riverwalk Capital Improvements

Riverwalk Capital Improvements
  • Riverwalk Capital Improvements
  • Riverwalk Capital Improvements
  • Riverwalk Capital Improvements
  • Riverwalk Capital Improvements
  • Riverwalk Capital Improvements
  • Riverwalk Capital Improvements

Riverwalk Capital Improvements

Utilizing topographic and LEICA Scanning Technology, BMB provided horizontal and vertical control surveying services and 3D representations in these specific areas:

  • Area 8 – La Mansion, Navarro Street Stairs (660 ft.), and South Bank (400 ft.)
  • Area 9 – West Bank, South of Pedestrian Bridge of Crockett (320 ft.)
  • Area 10a & b – Market Street Pedestrian Bridge street level to Hilton (620 ft.)
  • Area 11 – S Presa Bridge to W of Navarro Bridge, Wedding Island and street access (420 ft.)
  • Area 12 – Chamber of Commerce Bldg. river bank, pedestrian bridges at river fork and street level of Commerce Street
  • Area 13-20 – River Bend and River Extension, Market Bridge to Alamo Bridge, Inner Loop from N Flood Gate to The South Bank Complex

Client

City of San Antonio

Location

San Antonio, Texas

Status

Complete

Lorem Ipsum has been the industrys standard dummy text ever since @ ThemeRox
What Our Clients Are Saying

David Pulido, P.E. – City of San Antonio

It is my pleasure to provide this letter for Bain Medina Bain based on their performance for the Marbach Road Phase IIA (Military to Rawhide) project. Bain Medina Bain worked diligently with the City and all other consultants involved in the project to deliver design solutions that would offer long-lasting benefits and accommodate the growth in the area. They continued to stay responsive and available at a moment’s notice from design through project completion. This is one of the values that the City holds in the highest regards os our consultants.

Bain Medina Bain