Salado Creek Greenway Northern Segment

Salado Creek Greenway Northern Segment
  • Salado Creek Greenway Northern Segment
  • Salado Creek Greenway Northern Segment
  • Salado Creek Greenway Northern Segment
  • Salado Creek Greenway Northern Segment
  • Salado Creek Greenway Northern Segment
  • Salado Creek Greenway Northern Segment
BMB provided civil services for approximately 4 miles of hike and bike trials and associated amenities along the Salado Creek. The trail stretched from McAllister Park through Loop 410. The primary objective focused efforts on analyzing the impact on the water surface elevation and pilot channels for one (1) main low water crossing and multiple tributary crossings located within the 100-year existing flood plain. The low water crossings directly crossed the Salado Creek and its tributaries. Besides analyzing the creeks for the low water crossings, further analysis was done for the canopy structure crossing under the Railroad Bridge and impact of the trail going under Loop 410. This analysis was submitted to TxDOT for approval, in addition to the City of San Antonio

Client

City of San Antonio

Location

San Antonio, Texas

Status

Complete

Lorem Ipsum has been the industrys standard dummy text ever since @ ThemeRox
What Our Clients Are Saying

David R. Wegmann, P.E. – County of Bexar

I have had the opportunity to work with Bain Medina Bain on civil engineering and surveying contracts for Bexar County. Bain Medina Bain has demonstrated exceptional knowledge of transportation and drainage design. Their expertise and solutions based approach keeps their firm on our list of preferred consultants. I look forward to a continued and positive working relationship with Bain Medina Bain and recommend using their services.

Bain Medina Bain