San Antonio Water System

San Antonio Water System

Slide 1 Heading
Lorem ipsum dolor sit amet consectetur adipiscing elit dolor
Click Here
Slide Heading
Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.
Click Here
Slide Heading
Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.
Click Here
Slide Heading
Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.
Click Here
Slide Heading
Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.
Click Here
Slide Heading
Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.
Click Here

SAWS experience

For over 30 years, BMB has provided a diverse range of both civil design and survey services to SAWS on a variety of projects involving the rehabilitation and/or reconstruction of sewer and water systems, lift stations, storage tanks, and treatment plants, many of which involved joint coordination with the City of San Antonio. 

Having an established relationship with SAWS allows us to interpret their needs and deliver a successful project every time. Providing Surveying, Preparation of topographic surveys, As-built surveys, Sewer design plans, Utility coordination, Water main replacement, Water and sewer facilities investigations, Pothole data analysis, Replacement and installation of water and wastewater facilities and infrastructure.

As a preferred vendor for SAWS, BMB has secured numerous projects/contracts with the local utility. Through our contract projects, BMB has provided professional services for the following task orders:

  • 2021 Water Main Replacement
  • 2020 Water Main Designs Project
  • Highland Hills Water Main replacement
  • 2020 CMOM Package 2 SSORP
  • 2020 Production Facilities Improvement
  • King Street Pump Station Improvements 
  • 2020 Water Production Storage Tank 
  • Bitters GST Tank Replacement 
  • Cagnon GST Replacement
  • 2019 Risk and Condition Assessment of Water 
  • 2019 Small Capacity Constraints Engineering Design Services
  • 2019 SSORP Engineering Design BPC Central Small Diameter Package 4 CIPP, PB & OC
  • 2019 Water Main Replacement Engineering Contract
  • DSP PZ 1295 & PZ 10 Interconnect 
  • #2 Cresthaven Heights Water Main Replacement 
  • #3 Summer Sun Lane Water Main Replacement
  • 2018 SSORP Engineering Design Services Small Diameter BPC Central Package 2
  • 2018 Pipeline Engineering Work Order Contract – Highway 90 & General McMullen
  • 2017 SSORP South Zarzamora St. Up-size & Relief
  • 2017 Pipeline Engineering Services Work Order Contract 
  • E-19: Seguin to Nacogdoches Survey
  • E-20 Wurzbach Parkway Survey
  • 2016 Pipeline Engineering Work Order Services 
  • 2015 Governmental Engineering Services Work Order 
  • 2014 Engineering Services Work Order Governmental Contract 
  • 2013 Engineering Design Services – Replacements & Improvements 
  • 2013 Unspecified Engineering Services Governmental
  • 2011 Replacement & Improvements Surveying
  • 2010 Professional Unspecified Engineering Governmental Design Services
  • 2008 Governmental Engineering Design R&I

Our Team Will Make The Difference For Your Next Project Success!