San Antonio Independent School District

San antonio
Independent School District

Slide 1 Heading
Lorem ipsum dolor sit amet consectetur adipiscing elit dolor
Click Here
Slide 2 Heading
Lorem ipsum dolor sit amet consectetur adipiscing elit dolor
Click Here
Slide Heading
Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.
Click Here
Slide Heading
Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.
Click Here
Slide Heading
Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.
Click Here
Slide Heading
Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.
Click Here
Slide Heading
Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.
Click Here
Slide Heading
Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.
Click Here
Slide Heading
Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.
Click Here
Slide Heading
Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.
Click Here

SAISD experience

BMB has provided as-needed civil engineering and survey services on a succession of contracts involving expansion and new development at multiple campus sites for the SAISD – 2016, & 2010 Bond Programs. 

BMB has managed projects over 25 schools within the SAISD, including historic restorations at Mark Twain and Whittier Middle Schools. Providing the following professional services platting, re-platting; zoning changes; parcel acquisitions; Street and alley closures; drainage studies, SW3P, grading plans, street dedications, ADA sidewalk design, parking lot and bus easement locations, traffic impact analysis; boundary topographic surveys; easement locates; and construction staking.

  • 2016 Bond Program
  • 2010 Capital Improvement Program 
  • 2010 Rogers Elementary School 
  • 2010 Bonham Elementary School 
  • 2010 Washington Elementary School 
  • 2010 Margil Elementary School 

 

 

 

Our Team Will Make The Difference For Your Next Project Success!