San Antonio River Authority

San antonio River Authority

Slide 1 Heading
Lorem ipsum dolor sit amet consectetur adipiscing elit dolor
Click Here
Slide Heading
Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.
Click Here
Slide Heading
Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.
Click Here
Slide Heading
Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.
Click Here
Slide Heading
Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.
Click Here
Slide Heading
Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.
Click Here

SARA experience

BMB has worked directly and indirectly with the SARA for over 20 years on a variety of projects involving rehabilitation and/or reconstruction of sewer and water systems, lift stations, storage tanks, and treatment plans. Many of our projects involved joint coordination with the COSA, Bexar County, and other utility agencies. 

Our experience includes Surveying, Topographic, Boundary, Right-of-Way, Parcels, Civil Engineering, SW3P, Traffic Control, Drainage Design, Hydrologic Analysis & Design, Hydraulic Analysis & Design, and FEMA Mapping.

BMB strives to provide excellence from the beginning to the end of a specific project or contract. Over the last 20 years, BMB has exceeded SARA’S expectations and as a result, we are considered one of SARA’s go-to firms. 

Below is a sample listing of our projects highlighting our experience with SARA.

  • Mission Reach Street Connections
  • SARA 2011 Land Surveying IDIQ Contract
  • Mission Reach Ecosystem and Recreation Project
  • Mission Reach Construction Control & Surveying Services Project
  • South Cross Maintenance Shop Site Parcels
  • Medio Creek Cross-Sections
  • Salado Creek Dam Monumentation/Salado 13A & 13B
  • Salado Creek Dam Monumentation/Signage 9
  • Eagleland Reach
  • Regional Watershed Modeling
  • Salatrillo Creek Pump Station Subdivision Plat Reuse Line
  • Mission Reach – Medina Watershed Master Plan
  • Mission Reach Phase II, Plat and Description for Mission San Jose Portal
  • Calaveras Dam Structure Site #6
  • Probandt & Concepcion Creek
  • VFM Parcel for Re-Staking

Our Team Will Make The Difference For Your Next Project Success!